{"id":26,"date":"2018-04-04T16:42:30","date_gmt":"2018-04-04T14:42:30","guid":{"rendered":"https:\/\/www.evolution-team.com\/en-gb\/?page_id=26"},"modified":"2019-06-10T13:25:37","modified_gmt":"2019-06-10T11:25:37","slug":"references","status":"publish","type":"page","link":"https:\/\/www.evolution-team.com\/en-gb\/references\/","title":{"rendered":"References"},"content":{"rendered":"<section class=\"dv-content__section\" style=\"background:none 50% 50% \/ cover no-repeat scroll;background-color: rgba(255, 255, 255, 0);padding-bottom:32px;padding-top:32px;\"><div class=\"dv-content__section-inner dv-content--width-large\" style=\"padding-left:16px;padding-right:16px;\">\r\n<h2>Top-Projects in the Project management<\/h2>\r\n<div class=\"dv-grid content-grid\" style=\"margin-top: -8px;\">\r\n<div class=\"dv-grid__cell dv-grid__cell--4\">\r\n<div class=\"dv-card\">\r\n<div class=\"dv-card__media\">\r\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"\/\/www.evolution-team.com\/de-de\/wp-content\/uploads\/top_reference_mercedes.jpg\" alt=\"\" width=\"1920\" height=\"1080\">\r\n<\/div>\r\n<div class=\"dv-card__header\">\r\n<div class=\"dv-card__title\">Daimler A-Class<\/div>\r\n<\/div>\r\n<div class=\"dv-card__content\">\r\n<p><strong>Description:<\/strong> Door panel CLA Plant coordination in the SOP; Relocation A-Class<\/p>\r\n<p><strong>Country:<\/strong> DE \/ HU<\/p>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<div class=\"dv-grid__cell dv-grid__cell--4\">\r\n<div class=\"dv-card\">\r\n<div class=\"dv-card__media\">\r\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"\/\/www.evolution-team.com\/de-de\/wp-content\/uploads\/top_reference_maserati.jpg\" alt=\"\" width=\"1920\" height=\"1080\">\r\n<\/div>\r\n<div class=\"dv-card__header\">\r\n<div class=\"dv-card__title\">Maserati<\/div>\r\n<\/div>\r\n<div class=\"dv-card__content\">\r\n<p><strong>Description:<\/strong> Industrialisation support for laminating, welding and assembly instrument panel processes<\/p>\r\n<p><strong>Country:<\/strong> DE<\/p>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<div class=\"dv-grid__cell dv-grid__cell--4\">\r\n<div class=\"dv-card\">\r\n<div class=\"dv-card__media\">\r\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"\/\/www.evolution-team.com\/de-de\/wp-content\/uploads\/top_reference_bmw.jpg\" alt=\"\" width=\"1920\" height=\"1080\">\r\n<\/div>\r\n<div class=\"dv-card__header\">\r\n<div class=\"dv-card__title\">BMW 6 GT<\/div>\r\n<\/div>\r\n<div class=\"dv-card__content\">\r\n<p><strong>Description:<\/strong> Start-up support for tool technology for laminating and edgefolding, US welding, bonding application system, EOL inspection system for door trim<\/p>\r\n<p><strong>Country:<\/strong> DE<\/p>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div>\r\n<\/div><\/section>\r\n<section class=\"dv-content__section\" style=\"background:none 50% 50% \/ cover no-repeat scroll;background-color: rgb(245, 245, 245);padding-bottom:32px;padding-top:32px;\"><div class=\"dv-content__section-inner dv-content--width-large\" style=\"padding-left:16px;padding-right:16px;\">\r\n<h2>Detailed project overview<\/h2>\r\n<h3>Projects 2017<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Analyse und Optimierung Fertigung von Holz- Zierblenden<\/td>\r\n<td>RO<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 6 GT<\/td>\r\n<td>Anlaufunterst\u00fctzung in der Anlagen und Werkzeugtechnik f\u00fcr Kaschieren sowie Umbugen, US-Schwei\u00dfen, Kleberauftragsanlage, EOL-Pr\u00fcfanlage f\u00fcr T\u00fcrverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW Mini<\/td>\r\n<td>Optimierung Kleberauftrag und Kaschierung Mini Armauflage<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Mittelkonsole BMW X3 &#8211; Installation Anlagen und Werkzeugtechnik in China<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Audi Q2<\/td>\r\n<td>Optimierung Alu-Zierblendenfertigung- Lean Management<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Kalkulationen Spritzgie\u00df-Werkzeugkosten<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Daimler<\/td>\r\n<td>Anwendungstechnische Unterst\u00fctzung Spritzgie\u00dfen Cabrio Abdeckung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>T\u00fcrverkleidung BMW &#8211; Beschaffungsunterst\u00fctzung Anlagen und Werkzeugtechnik<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2016<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Kalkulationen Werkzeugkosten<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 6 GT<\/td>\r\n<td>Unterst\u00fctzung in der Anlagen, Werkzeugtechnik f\u00fcr Kaschieren und Umbugen der kompletten T\u00fcrinnenverkleidung sowie Hotmelt Kleber Beschichtung Bezugsmaterialien<\/td>\r\n<td>DE \/ CZ<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Konzepte Teilkaschierung T\u00fcrverkleidungen<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Mittelkonsole BMW X3<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Audi Q2<\/td>\r\n<td>Optimierung Zierblenden Alu-Hinterspritzen<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Porschen Macan<\/td>\r\n<td>Prozessanalyse Zierblenden schwei\u00dfen<\/td>\r\n<td>RO<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW, Porsche, Mini<\/td>\r\n<td>Verlagerung von 3 Fertigungslinien Anlaufunterst\u00fctzung Dachhimmel Porsche Macan<\/td>\r\n<td>AT<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Porsche Panamera<\/td>\r\n<td>Entwicklung Kleberschablonen f\u00fcr Lederbez\u00fcge<\/td>\r\n<td>SK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW X1<\/td>\r\n<td>Anlaufunterst\u00fctzung TV BMW X1<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW<\/td>\r\n<td>Optimierung von Fr\u00e4s- und B\u00fcrstanlagen f\u00fcr IMD- Folien-Hinterspritzte Radio und Zierblenden<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2015<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW Mini<\/td>\r\n<td>Prozessoptimierung Thermoformen und Hinterp\u00e4gen T\u00fcrverkleidung BMW Mini<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW Mini<\/td>\r\n<td>Technische und terminliche Betreuung Stanz- und Spritzgusswerkzeuge, Optimierung Stanz- und Nachfolgeprozesse<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Maserati<\/td>\r\n<td>Planung und Beschaffung der Betriebsmittel f\u00fcr ein Cockpit (Nachfolgeprojekt), Standort Rum\u00e4nien<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Koordination der Herstellung, Lieferung und Montage der F\u00f6rdertechnik, der Hochzeitsstation, sowie diverser Lastaufnahmemittel f\u00fcr den Neubau der Fertigung f\u00fcr den 5 Langversion in China<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Volkswagen<\/td>\r\n<td>Optimierung Schwei\u00dftechnologie Cockpit Golf A7<\/td>\r\n<td>ME<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 1 und 3<\/td>\r\n<td>Optimierung Sch\u00e4umprozess (Technische Optimierung, Nacharbeitsreduzierung)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Masarati<\/td>\r\n<td>Betriebsmittelplanung Cockpit<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Betriebsmittelplanung Mittelkonsole BMW<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW Mini<\/td>\r\n<td>Vakuumkaschieren Armauflage<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Klebe- und Kaschiertechnologie BMW 5 GT<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Mercedes<\/td>\r\n<td>Arbeitsplatzoptimierung und Zeitstudien<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 1 und 3<\/td>\r\n<td>Optimierung Sch\u00e4umprozess Cockpit<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW X1<\/td>\r\n<td>Anlaufunterst\u00fctzung TV BMW X1<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Kalkulationen Werkzeugkosten<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 5GT<\/td>\r\n<td>Unterst\u00fctzung in der Anlagen, Werkzeugtechnik f\u00fcr Kaschieren und Umbugen der kompletten T\u00fcrinnenverkleidung sowie Hotmail Beschichtung Bezugsmaterialien<\/td>\r\n<td>DE \/ CZ<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2014<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW Mini<\/td>\r\n<td>Technische und terminliche Betreuung Stanz- und Spritzgusswerkzeuge, Optimierung Stanz- und Nachfolgeprozesse<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW Mini<\/td>\r\n<td>Optimierung Thermoformprozess<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Jaguar\/Land Rover<\/td>\r\n<td>Technische und terminliche Betreuung Stanzprozess inklusive Werkzeuge<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Maserati<\/td>\r\n<td>Planung und Beschaffung der Betriebsmittel f\u00fcr ein Cockpit (Nachfolgeprojekt), Standort Rum\u00e4nien<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Koordination der Herstellung, Lieferung und Montage der F\u00f6rdertechnik, der Hochzeitsstation, sowie diverser Lastaufnahmemittel f\u00fcr den Neubau der Fertigung f\u00fcr den 5 Langversion in China.<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Audi Q7<\/td>\r\n<td>Lastenhefte f\u00fcr Vakuumkaschieren, Umbugtechnologie T\u00fcrverkleidung Audi Q7<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Porsche, Daimler<\/td>\r\n<td>Prozess- und Arbeitsablaufoptimierung MFA &#8211; Stirnwand Logistik- und Ablaufoptimierung Porsche-Kofferraumund Daimler-Kofferraum Lager- und Logistikkonzept Porsche Innenraum<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW Mini<\/td>\r\n<td>Projektmanagement Spritzgusswerkzeuge und Lieferantenkoordinierung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2013<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>Daimler<\/td>\r\n<td>CLA Anlagenkoordinierung bis zum SOP und Prozessoptimierung Verlagerung A-Klasse<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Maserati IP<\/td>\r\n<td>Industrialisierungsunterst\u00fctzung f\u00fcr Prozesse Kaschieren, Schwei\u00dfen und Montage Instrumententafel<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Audi Q7<\/td>\r\n<td>Lastenhefte f\u00fcr Vakuumkaschieren, Umbugtechnologie T\u00fcrverkleidung Audi Q7<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Koordination der Herstellung, Lieferung und Montage der F\u00f6rdertechnik, der Hochzeitsstation, sowie diverser Lastaufnahmemittel f\u00fcr den Neubau der Fertigung f\u00fcr den 5 Langversion in China.<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>PLG<\/td>\r\n<td>Koordination der Herstellung, Lieferung und Montage der Erweiterung der Schubplattentechnik f\u00fcr den Karossen Innenausbau des neuen MACAN sowie der Skid F\u00f6rdertechnik inklusive T\u00fcraufnahmerahmen f\u00fcr den Innenausbau der T\u00fcren des neuen MACAN<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2012<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>Daimler<\/td>\r\n<td>A-Klasse Industrialisierungsunterst\u00fctzung Prozesse Vakuumkaschieren, Klebertechnologie und Tr\u00e4gerteil pressen f\u00fcr T\u00fcrverkleidungen im Werk Ungarn<\/td>\r\n<td>HU<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Maserati<\/td>\r\n<td>Industrialisierungsunterst\u00fctzung f\u00fcr Prozesse Kaschieren, Schwei\u00dfen und Montage Instrumententafel<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Retrofitma\u00dfnahmen Sch\u00e4umrundtisch und PUR- Tanklager<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2011<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Unterst\u00fctzung f\u00fcr Montageanlage LK Lastenhefte, Lieferanten-Kooridnation, Anlaufunterst\u00fctzung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Daimler<\/td>\r\n<td>NFPP Beschichtung T\u00fcrverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Frimo<\/td>\r\n<td>Sch\u00e4umanlage &#8211; Greifersystem LK<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Miko<\/td>\r\n<td>Produkt- und Prozessplanung Spritzgie\u00dfteile<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Projektunterst\u00fctzung im Elastomerbereich<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Layout- und Logistikplanung f\u00fcr BMW<\/td>\r\n<td>CN<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2010<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><\/td>\r\n<td>Cost Saving Interiorbauteile<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Roboterprogrammierung Oberfl\u00e4chentechnologie<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Porsche<\/td>\r\n<td>Spritzgie\u00df-WZ Verlagerung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2009<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Optimierung Materialeigenschaft in Bezug auf IMC- Spr\u00fchhaut<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Prozessanalyse Schwei\u00dftechnik I-Tafel<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Anlaufkoordination Mittelkonsole BMW X 1<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Toyota<\/td>\r\n<td>Optimierung im Fertigungsprozess<\/td>\r\n<td>UK<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Roboterprogrammierung Oberfl\u00e4chentechnologie<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werksplanung<\/td>\r\n<td>Produktionsoptimierung( Materialfluss, Layout, Logistik, Fertigungssteuerung)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Qualit\u00e4tssicherung Bauteile Interieur<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Daimler<\/td>\r\n<td>Anlaufunterst\u00fctzung Automatisierungstechnik<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>KIA<\/td>\r\n<td>Anlaufunterst\u00fctzung Verfahrensbereiche Slushen und Sch\u00e4umen<\/td>\r\n<td>CZ<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2008<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>Werksplanung<\/td>\r\n<td>Produktionsoptimierung (Materialfluss, Layout, Logistik, Fertigungssteuerung)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Technologie<\/td>\r\n<td>Konzeptentwicklung Interieur Bauteil<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Daimler<\/td>\r\n<td>Anlaufunterst\u00fctzung R\u00fccksitzlehne<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Marktanalyse und Verfahrensvergleiche von galvanisierten Kunststoffteilen<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Anlaufunterst\u00fctzung im Engineering I-Tafel BMW 1 Meerane \/ Leipzig<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Audi<\/td>\r\n<td>Unterst\u00fctzung Industrialisierung und Optimierung Fertigungsablauf und Layout Audi<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Multiprojektsteuerung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Planungsunterst\u00fctzung f\u00fcr Werkzeuge der Oberfl\u00e4chentechnologie<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Technologie<\/td>\r\n<td>Unterst\u00fctzung Anwendungstechnik SG &#8211; WZ<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Roboterprogrammierung Oberfl\u00e4chentechnologie<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Anlaufunterst\u00fctzung Automatisierungstechnik<\/td>\r\n<td>AT<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>DAIMLER<\/td>\r\n<td>Industrialisierung Produktion Schaumteile<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Qualit\u00e4tssicherung Bauteile Interieur<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Rolls Royce<\/td>\r\n<td>Lieferantenkoordinierung f\u00fcr Werkzeug- und Anlagentechnik<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Kalkulation und Kostenplanung Spritzgie\u00dfwerkzeuge, Hinterspritzwerkzeuge, 2K-Werkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Rolls Royce<\/td>\r\n<td>Planungsunterst\u00fctzung in der Prozesstechnik LFI sowie Nachfolgeprozesse<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Audi<\/td>\r\n<td>Anlaufunterst\u00fctzung beim Unterlieferant f\u00fcr Griffe TV<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Qualit\u00e4tslenkung Cockpit und Ausstattung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2007<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>Medizintechnische Maschinen \/ Anlagen<\/td>\r\n<td>Lieferantenkoordinierung vor Ort<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Spezifikation Anlagentechnik f\u00fcr Oberfl\u00e4chentechnologie<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Planungsunterst\u00fctzung f\u00fcr Werkzeuge der Oberfl\u00e4chentechnologie<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Audi<\/td>\r\n<td>Industrialisierung Sch\u00e4um- und Montageprozesse Stirnwand Audi<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Jaguar<\/td>\r\n<td>Betreuung Spritzgie\u00dfwerkzeuge<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Qualit\u00e4tssicherung Bauteile Interieur<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeug- und Anlagentechnik<\/td>\r\n<td>Verlagerung von Spritzgie\u00dfanlagen und -werkzeugen<\/td>\r\n<td>AT<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Planungsunterst\u00fctzung bei Spritzgie\u00dfwerkzeugen<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Rolls Royce<\/td>\r\n<td>Lieferantenkoordinierung f\u00fcr Werkzeug- und Anlagentechnik<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Rolls Royce<\/td>\r\n<td>Planungsunterst\u00fctzung in der Prozesstechnik LFI sowie Nachfolgeprozesse<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Qualit\u00e4tslenkung Cockpit und Ausstattung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2006<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Innenausstattungsteile Individual: CNC-N\u00e4hen, Lederzuschnitte<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Industrialisierung N\u00e4htechnik und Anlaufkoordination<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Opel Corsa<\/td>\r\n<td>Industrialisierung, Prozessoptimierung und Anlaufkoordination<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Optimierung<\/td>\r\n<td>Projektmanagementstruktur<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Verfahrenstechnische Unterst\u00fctzung (Lederkaschierung I-Tafel)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW<\/td>\r\n<td>Planungsunterst\u00fctzung im Bereich Spritzgie\u00dfen<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Industrialisierung Kaschier- und Umbugtechnik<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Verfahrenstechnische Unterst\u00fctzung im Bereich Spritzgie\u00df- und Kaschiertechnik<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2005<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Verfahrensplanung N\u00e4herei Blende Mitte und Armauflage<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Prozessoptimierung der Fertigung nach dem Toyota- Prinzip<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Optimierung<\/td>\r\n<td>Projektmanagement- und Fertigungsanalyse<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Optimierung<\/td>\r\n<td>Projektmanagementanalyse<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Benchmarking<\/td>\r\n<td>Marktanalyse Lackfolientechnik<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Technologie<\/td>\r\n<td>Verfahrensentwicklung f\u00fcr die Herstellung von Lackfolien-Tiefziehteilen (Projektunterst\u00fctzung, Fertigung Prototypenteile)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Opel Corsa<\/td>\r\n<td>Industrialisierung komplette Anlagentechnik f\u00fcr die Herstellung der Instrumententafel (inklusive Materialfluss- und Logistikplanung)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Optimierung<\/td>\r\n<td>Projektmanagementorganisation<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2004<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW 3 (Cabrio\/Coupe)<\/td>\r\n<td>Konzeption Lastenheft \u201eKaschieren und Umbugen\u201c, Lieferanten-vergleiche, Lieferantenbetreuung f\u00fcr Blende Mitte und Armauflage<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3 (Cabrio\/Coupe)<\/td>\r\n<td>Konzeption N\u00e4hautomat, Verfahrensunterst\u00fctzung, Projekt- betreuung \u201eLederkaschieren Blende Mitte\u201c f\u00fcr die T\u00fcrverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Projektmanagementunterst\u00fctzung als Teilprojektleiter F\u00fcgetechnik f\u00fcr die Instrumententafel<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Passat (China)<\/td>\r\n<td>Projektmanagementunterst\u00fctzung als Projektleiter Spritzgie\u00dfwerkzeuge f\u00fcr Instrumententafel und T\u00fcrverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf<\/td>\r\n<td>Planungsunterst\u00fctzung f\u00fcr die Betriebsmittel zur Herstellung der T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf Plus<\/td>\r\n<td>Planungsunterst\u00fctzung f\u00fcr die Betriebsmittel zur Herstellung der T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf<\/td>\r\n<td>Anlauf &#8211; und Koordinationsunterst\u00fctzung in der Fertigung f\u00fcr die T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf Plus<\/td>\r\n<td>Materialflussplanung und Logistikplanung f\u00fcr die Fertigung der T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2003<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Layoutplanung und Fertigungsverlagerung der N\u00e4hautomaten in der Lederfertigung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3 (Limousine\/Touring)<\/td>\r\n<td>Konzeption Lastenheft \u201eKaschieren und Umbugen\u201c, Lieferantenvergleiche, Lieferantenbetreuung f\u00fcr Blende Mitte und Armauflage<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3 (Limousine\/Touring)<\/td>\r\n<td>Konzeption N\u00e4hautomat, Verfahrensunterst\u00fctzung, Projektbetreuung \u201eLederkaschieren\u201c f\u00fcr Blende Mitte und Armauflage<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf<\/td>\r\n<td>Planungsunterst\u00fctzung f\u00fcr die Betriebsmittel zur Herstellung der T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Projektleitung \u201eSchweissen und F\u00fcgen Instrumententafel\u201c<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2002<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>VW T5<\/td>\r\n<td>Projektmanagementanalyse und Ablaufoptimierung, Layoutplanung der Fertigungsstra\u00dfe<\/td>\r\n<td>AT<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>BMW 5<\/td>\r\n<td>Layoutplanung der Fertigung in Landshut(Instrumententafel)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Mini<\/td>\r\n<td>Verfahrensvergleich verschiedener Herstellverfahren f\u00fcr die Hutablage<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Benchmarking<\/td>\r\n<td>Marktanalyse Kabelummantelungsb\u00e4nder<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Lancia<\/td>\r\n<td>Projektierung und Bau von drei Spritzgie\u00dfwerkzeugen f\u00fcr die Navigationsblende<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Bentley<\/td>\r\n<td>Projektierung und Bau von f\u00fcnf Spritzgie\u00dfwerkzeugen f\u00fcr Reflektoren<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Optimierung<\/td>\r\n<td>Maschinenanalyse f\u00fcr die Hotmeltf\u00fcgeeinrichtung der T\u00fcrinnenverkleidung und Seitenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf<\/td>\r\n<td>Planungsunterst\u00fctzung f\u00fcr die Betriebsmittel zur Herstellung der T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2001<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>BMW 3<\/td>\r\n<td>Erstellung eines Fertigungskonzeptes inklusive Layoutplanung f\u00fcr die T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Daimler Chrysler MB E-Klasse<\/td>\r\n<td>Projektengineering Navigationsblende<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Daimler Chrysler MB RSE<\/td>\r\n<td>Projektierung und Bau von f\u00fcnf Spritzgie\u00dfwerkzeugen f\u00fcr die Navigationsblende<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Passat \/ MB C-Klasse<\/td>\r\n<td>Benchmarking T\u00fcrmodule<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Werkzeugtechnik<\/td>\r\n<td>Versuchskaschierwerkzeug<\/td>\r\n<td>AT<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Touran<\/td>\r\n<td>Konzeption, Engineering und Lieferantenauswahl f\u00fcr die Beschneidetechnologie des stoffhinterspritzten Inserts f\u00fcr die T\u00fcrverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf<\/td>\r\n<td>Prototypenteile T\u00fcrinnenverkleidung (TPO Folie auf PP Tr\u00e4ger)<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Golf<\/td>\r\n<td>Verfahrensvergleich Instrumententafel anhand des IMG- Verfahrens &#8211; Aufbringung der Oberfl\u00e4chennarbung im Thermoformwerkzeug<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<h3>Projects 2000<\/h3>\r\n<table class=\"dv-table references-table\">\r\n<thead>\r\n<tr>\r\n<th>Model<\/th>\r\n<th>Description<\/th>\r\n<th>Country<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>Daimler Chrysler MB E-Klasse<\/td>\r\n<td>Konstruktion Spritzgie\u00dfwerkzeug<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>VW Phaeton<\/td>\r\n<td>Gesamtlinienplanung f\u00fcr die Industrialisierung der kompletten Anlagen- und Werkzeugtechnik zur Herstellung der T\u00fcrinnenverkleidung<\/td>\r\n<td>DE<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<\/div><\/section>\r\n","protected":false},"excerpt":{"rendered":"<p>[dv-theme-section background_color=\u201crgba(255, 255, 255, 0)\u201c background_image=\u201cnone 50% 50% \/ cover no-repeat scroll\u201c border_bottom=\u201c0\u2033 border_top=\u201c0\u2033 color=\u201crgb(0, 0, 0)\u201c height=\u201cauto\u201c inner_width=\u201clarge\u201c padding_bottom=\u201c32\u2033 padding_top=\u201c32\u2033] Top-Projects in the Project management Daimler A-ClassDescription: Door panel CLA Plant coordination in the SOP; Relocation A-ClassCountry: DE \/ HU MaseratiDescription: Industrialisation support for laminating, welding and assembly instrument panel processesCountry: DE BMW 6 [\u2026]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/pages\/26"}],"collection":[{"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/comments?post=26"}],"version-history":[{"count":3,"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/pages\/26\/revisions"}],"predecessor-version":[{"id":558,"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/pages\/26\/revisions\/558"}],"wp:attachment":[{"href":"https:\/\/www.evolution-team.com\/en-gb\/wp-json\/wp\/v2\/media?parent=26"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}